Duke FLEXIBLE BATCH BROILER Specifiche Pagina 7

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 6
Broiler
Operating Sequence
Broiler
Operating Sequence
Startup-
After powering on the unit the broiler will go into a preheat mode to reach
the proper operating temperature of 680 degrees F.
The controller will read “rdY”
for ready when the unit is properly up to
temperature and the light above the controller will also go out to indicate
the unit is ready to load.
Controller has
reached operating
temperature and
ready to load
Red light will
go off when unit
is ready to load
Vedere la pagina 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 89 90

Commenti su questo manuale

Nessun commento